The administrative location of Memmert, in Schwabach, where the central data center is located, was scheduled to renew the power line to the company. Since the ongoing conversion work could put a stop to production, a solution had to be found as quickly as possible. The ILS Central Franconia South alerted the technical advisor at THW Schwabach, Uli Kleinöder, who, together with Jan Lingl, IT system administrator at Memmert, received an overview of the situation.